Build Faster

Save Money

Fewer Headaches

We think it's time to re-evaluate traditional framing

  • Skilled labor is increasingly harder to find
  • Lumber prices fluctuate often and are impossible to predict
  • A constantly shifting schedule is draining you
  • You can't afford another weather delay
  • Clients are demanding more sustainable methods
  • Concrete and structural steel will kill the budget

Could you skip all those issues and still deliver on budget?

Absolutely! We engineer prefabricate and install Cold-formed steel (CFS) framing solutions to give you speed, quality, and cost savings. Your building will be enclosed in half the time. Guaranteed.
Speed Logo
Speed

Compared to stick framing, more CFS wall square footage can be set each day. Less curing downtime makes CFS faster than concrete, too.

Predictability Logo
Predictability

Offsite manufacturing utilizes BIM and precise 3D modeling to keep MEP on track. This also makes sure that trades are not interrupted

Savings Logo
Savings

The Wall-tech enclosure system is 30-40% cheaper than concrete. Average savings of $9/sq ft.

bucks progress east

Who We Are

At Wall-tech, We understand what it's like to deal with unpredictable schedules and project management headaches. We are construction veterans who've been in business for 35+ years and are a recognized leader in CFS prefabrication

Our team of experts in pre-planning, engineering, and project management can provide you with a tailored CFS framing solution to match your project. Your building will be completed faster and with superior quality.

Talk to us today so you can stop micromanaging slow projects and start delighting your clients with an on-time, on-budget delivery.

Talk To Us

How It Works

1

Talk to Us

We'll take some time to learn more about you and your project

2

Get an Engineered Solution

A customized integrated plan that fits your specifications, your budget, and your schedule.

3

Delight your Client

We guarantee that your building will be enclosed in half the time and on budget

See Our Work in Action

Metreau Apartments, Greenbay, WI - CFS enclosure resulted in $250k savings and an early delivery.

Case Study

These Iowa City luxury apartments initially had a 10-story concrete design that pushed the project over budget. To save money, the developer planned to compromise with wood framing and just 4 stories. Wall-tech offered a better solution.

20181017_144320


 

 

  • 6 Stories
  • Underground Parking
  • 1st Fl. Retail space
  • Precast concrete podium
  • Load bearing CFS enclosure system

CFS provided more stories than wood without the need to pay a premium for concrete and the additional parking that 10-stories would have required. With CFS, the developer got better flexibility in floor count and parking requirements.

What the process looks like

 

 

 

Prefabricated CFS framing for a mid-rise building

What our Customers are Saying

Expertly Coordinated

“Wall-tech was very committed to the team and working with the other contractors. I really appreciated the fact that they would coordinate their work to get it done in sequence. Once the drywall work was done they would notify the next person in line. When the customer wanted changes, Wall-tech spent a lot of time researching different solutions to find an application to meet the owner's needs.”

Melanie Taylor
The Boldt Company

Unsurpassed Quality

“Wall-tech worked closely with us at every stage of the project - from finding drywall, metal studs, and insulation with the highest possible recycled content to supplying us with the information we needed in a timely manner. Wall-tech was instrumental in helping us achieve LEED Gold certification in the construction of our new corporate headquarters in Madison, Wisconsin. They are a pleasure to work with and the quality of their workmanship is unsurpassed”

Holly Hawkins
Tri-North Builders

Positive Experience

“In my mind, everyone has to be a total team player. Wall-tech did a great job working with other subs to coordinate workflow and get the job done. As for the quality of their work, it exceeds that of other drywall companies we've worked with in the past. In every possible way, working with Wall-tech was a positive experience.”

Dave Hoff
Mortenson Construction

Our Past Projects

bucks

Fiserv Forum Arena – Milwaukee, WI.

  • 170 field personnel and 14 foremen— each running several crews
  • Interior framing, drywall, and misc. carpentry
  • Exterior enclosure, engineering, and prefabrication of CFS framing
Learn More
metreau photo

Metreau Appartments - Green Bay, WI

CFS Enclosure $250,000 in savings & early delivery.

Learn More
milwaukee-ballet

Milwaukee Ballet - Milwaukee, WI

Baumgartner Center for Dance. CFS Enclosure 40-day schedule … finished in just 7 days.

Learn More
Cold Formed Steel Framing

The benefits of designing with Prefab Panels

Do you want to learn more? FREE DOWNLOAD - The 5 steps to prefab success to save you money on your next project and the benefits of designing in prefab construction

Complete the form below to receive the free PDF download