Looking for Prefabricated Solutions? Visit Wall-panel Prefab. Looking for Homes & Studios? visit Homes & Studios
Most contractors have reported a schedule savings of 8 weeks or more when they opted for CFS Prefabrication
Build Faster
Save Money
Fewer Headaches
Compared to stick framing, more CFS wall square footage can be set each day. Less curing downtime makes CFS faster than concrete, too.
Offsite manufacturing utilizes BIM and precise 3D modeling to keep MEP on track. This also makes sure that trades are not interrupted
The Wall-tech enclosure system is 30-40% cheaper than concrete. Average savings of $9/sq ft.
At Wall-tech, We understand what it's like to deal with unpredictable schedules and project management headaches. We are construction veterans who've been in business for 35+ years and are a recognized leader in CFS prefabrication
Our team of experts in pre-planning, engineering, and project management can provide you with a tailored CFS framing solution to match your project. Your building will be completed faster and with superior quality.
Talk to us today so you can stop micromanaging slow projects and start delighting your clients with an on-time, on-budget delivery.
We'll take some time to learn more about you and your project
A customized integrated plan that fits your specifications, your budget, and your schedule.
We guarantee that your building will be enclosed in half the time and on budget
Metreau Apartments, Greenbay, WI - CFS enclosure resulted in $250k savings and an early delivery.
CFS provided more stories than wood without the need to pay a premium for concrete and the additional parking that 10-stories would have required. With CFS, the developer got better flexibility in floor count and parking requirements.
Prefabricated CFS framing for a mid-rise building
“Wall-tech was very committed to the team and working with the other contractors. I really appreciated the fact that they would coordinate their work to get it done in sequence. Once the drywall work was done they would notify the next person in line. When the customer wanted changes, Wall-tech spent a lot of time researching different solutions to find an application to meet the owner's needs.”
“Wall-tech worked closely with us at every stage of the project - from finding drywall, metal studs, and insulation with the highest possible recycled content to supplying us with the information we needed in a timely manner. Wall-tech was instrumental in helping us achieve LEED Gold certification in the construction of our new corporate headquarters in Madison, Wisconsin. They are a pleasure to work with and the quality of their workmanship is unsurpassed”
“In my mind, everyone has to be a total team player. Wall-tech did a great job working with other subs to coordinate workflow and get the job done. As for the quality of their work, it exceeds that of other drywall companies we've worked with in the past. In every possible way, working with Wall-tech was a positive experience.”
Baumgartner Center for Dance. CFS Enclosure 40-day schedule … finished in just 7 days.
Learn MoreComplete the form below to receive the free PDF download
6135 N. American Lane Deforest, WI 53532
Have questions? Text or call us at 608-257-1595
Copyright 2024 Wall-tech and Wall-panel