Greater ROI

Faster Turnaround

Green Building

IMG_1365

When it comes to profitability, wood framing is problematic

  • It's slow - It takes months to enclose a multi-story building. And that's without accounting for weather delays and labor shortages
  • Wood Compresses - At a rate of 3/8” per floor, wood limits the number of stories you can build and rentable square footage.
  • It's flammable - The building is vulnerable to fire and thus higher insurance costs
  • It's high maintenance - It rots, shrinks, warps, and splits when exposed to the elements.

Prefabricated CFS Offers the best of both worlds

Cheaper than concrete and better than wood, prefabricated CFS framing ensures that your building is enclosed faster, safer, and on budget.

Cost-Effective

Lower insurance rates and shorter project cycles.

Durable

Steel will not warp, split, crack, or creep when exposed to the elements.

Speedy Installation

We manufacture off-site in a controlled environment and install in half the time. Guaranteed

Sustainable

All of our products use recycled steel and are 100% recyclable at the end of use

Lower Maintenance

Steel framing resists rot, termites, and moisture

Waste Reduction

Cuts down the need for on-site waste management

Customizable

Steel joists can be customized to fit the specifications and safety requirements of any project

Stronger

Steel has the highest strength to weight ratio of any material used in construction

Case Study

These Iowa City luxury apartments initially had a 10-story concrete design that pushed the project over budget. To save money, the developer planned to compromise with wood framing and just 4 stories. Wall-tech offered a better solution - CFS framing.

20181017_144320


 

 

  • 6 Stories
  • Underground Parking
  • 1st Fl. Retail space
  • Precast concrete podium
  • Load bearing CFS enclosure system

CFS provided more stories than wood without the need to pay a premium for concrete and the additional parking that 10-stories would have required. With CFS, the developer got better flexibility in floor count and parking requirements.

Talk To Us

untitled

Who We Are

At Wall-tech, We understand what it's like to deal with unpredictable schedules and project management headaches. We are construction veterans who've been in business for 35+ years and are a recognized leader in CFS prefabrication

Our team of experts in design-build, engineering, and manufacturing can provide you with a tailored CFS framing solution to match your vision. Your building will be of superior quality and will be turned over ahead of the move-in date.

Talk to us today so you can maximize your ROI and get a building that you will be proud of for generations.

How It Works

1

Talk to Us

We'll take some time to learn more about you and your project

2

Get an Engineered Solution

We stick to your vision while guaranteeing that we'll save time and money

3

Maximize your ROI

With a highly in-demand building and lower maintenance costs

See Our Work in Action

Metreau Apartments, Greenbay, WI - CFS enclosure resulted in $250k savings and an early delivery.

What the process looks like

 

 

 

What our Customers are Saying

Expertly Coordinated

“Wall-tech was very committed to the team and working with the other contractors. I really appreciated the fact that they would coordinate their work to get it done in sequence. Once the drywall work was done they would notify the next person in line. When the customer wanted changes, Wall-tech spent a lot of time researching different solutions to find an application to meet the owner's needs.”

Melanie Taylor
The Boldt Company

Unsurpassed Quality

“Wall-tech worked closely with us at every stage of the project - from finding drywall, metal studs, and insulation with the highest possible recycled content to supplying us with the information we needed in a timely manner. Wall-tech was instrumental in helping us achieve LEED Gold certification in the construction of our new corporate headquarters in Madison, Wisconsin. They are a pleasure to work with and the quality of their workmanship is unsurpassed”

Holly Hawkins
Tri-North Builders

Positive Experience

“In my mind, everyone has to be a total team player. Wall-tech did a great job working with other subs to coordinate workflow and get the job done. As for the quality of their work, it exceeds that of other drywall companies we've worked with in the past. In every possible way, working with Wall-tech was a positive experience.”

Dave Hoff
Mortenson Construction

Our Past Projects

IMG_5676

Fiserv Forum Arena – Milwaukee, WI.

  • 170 field personnel and 14 foremen— each running several crews
  • Interior framing, drywall, and misc. carpentry
  • Exterior enclosure, engineering, and prefabrication of CFS framing
Learn More
metreau photo

Metreau Appartments - Green Bay, WI

CFS Enclosure $250,000 in savings & early delivery.

Learn More
Picture1

Milwaukee Ballet - Milwaukee, WI

Baumgartner Center for Dance. CFS Enclosure 40-day schedule … finished in just 7 days.

Learn More
IMG_1496

The benefits of designing with Prefab Panels

Do you want to learn more? FREE DOWNLOAD - The 5 steps to prefab success to save you money on your next project and the benefits of designing in prefab construction

Complete the form below to receive the free PDF download