Cold-Formed Steel Framing
Built for Developers
Faster schedules, tighter budgets, fewer surprises on site.
Cold-formed steel lets you deliver more units in less time, with costs you can plan around. Prefabricated walls are built in the shop while your foundation goes in, so the building is enclosed sooner and carrying costs stop sooner.
Build Smarter from Day One
Nine decisions to make before the first wall goes up, gathered from architects, engineers, contractors, lenders, and the code. 19 pages, free.
What load-bearing prefabricated walls do
Load-bearing cold-formed steel framing works a lot like wood-frame construction. Walls carry the floors and roof the same way, but they're built with structural steel studs instead of lumber. It's a familiar idea, with a noncombustible structure that can go taller than wood.

Load-bearing CFS for mid-rise multifamily — schedule, budget, and height.
Three things that change on the job
Three ways prefabricated cold-formed steel framing helps your development.
Shop-built walls mean less weather delay
Panels are framed indoors and arrive ready for installation.
One trade instead of several
Framing, the air/vapor barrier, and insulation can all come in on the panel, so you are not coordinating those pieces in the field.
Designs that hold up from permit to punch list
Engineered panels go in the way they were drawn.
Proof
Metreau, Green Bay, WI
A 107-unit multifamily project where building faster with prefabricated cold-formed steel panels saved an estimated $250,000 in carrying costs alone.

Courtyard by Marriott, University Heights, IA
A 7-story hotel. 115,000 sq ft. The project came in over budget as precast. A redesign in load-bearing cold-formed steel saved about $10 per square foot and kept the work moving.

316 Madison, Iowa City, IA
Seven stories and about 67,000 sq ft of load-bearing cold-formed steel on a precast podium, with underground parking and first-floor retail. Wall-tech designed, prefabricated, and installed the framing, and the building was enclosed in under four months.

Most developers weigh wood or concrete. There’s a third option.
On a lot of multifamily deals, the structure conversation starts with two choices: wood if you need to keep first cost down, or concrete if you need height, parking, or a noncombustible building. Load-bearing cold-formed steel sits in the middle. You get more story count than light wood usually allows, without paying for a full concrete frame.
That’s the lane we work in — shop-built, load-bearing wall and floor panels for mid-rise apartments, hotels, and senior living.
See how wood, cold-formed steel, and concrete compare on height, cost, schedule, and underwriting. See how carriers already talk about combustible versus noncombustible structure.
Compare framing options · How underwriters price the structure
Bring us in early
Bringing a general contractor (GC) on early is the best path for any project, but that’s not always possible. If you’re still choosing a GC, you can bring Wall-tech in now to keep the key design decisions moving — bay spacing, openings, and stacking walls. We handle the cold-formed steel engineering in-house and work with your architect and engineer of record from the start. Once your GC is on board, we work alongside them so the panel package lands on schedule.
Send us your drawings, even early ones. Sketch sets and unfinished plans are fine. We’ll tell you what panelized cold-formed steel would do to schedule and budget on your building, and when wood or concrete is still the better answer.
Talk to our team
about your next development
Tell us about your next project and we'll show you what prefabricated walls can do for your schedule and your budget.